§ 01 / Case study

Three parts became one.

Electrical · export program

A three-piece cable gland consolidated into a single moulding — assembly cell deleted, unit cost down 31%.

3 → 1
Parts per assembly
31%
Unit cost reduction
18 s
Validated cycle
IM PART · REF 01
Three parts became one.
SECTOR · ELECTRICAL · EXPORT PROGRAM
PRESS · 120 t Chen Hsong
Drag to rotate · scroll to zoom
Problem

A cable gland arriving as body, nut and seal — three tools, three inspections, an assembly cell and a scrap rate nobody wanted to talk about.

Engineering move

A DFM pass merged the sealing petals into the body and moved the thread into the cavity. One tool, one shot, one part number.

Result

Assembly cell removed. Cost per unit fell with it, and the part now ships to two EU distributors on a rolling forecast.

§ The narrative
01 · As it arrived

An assembly pretending to be a part

Body, nut, elastomer seal. Each with its own tool, its own lead time, its own inspection gate. Every unit passed through hands before it passed through a box.

IM PART · REF 01
An assembly pretending to be a part
STATE · AS RECEIVED
PARTS · 3
TOOLS · 3
PROCESS · IM · 80–650 t
02 · The engineering move

Petals into the body, thread into the steel

We modelled the sealing petals as living features of the body wall and cut the thread directly into the cavity with an unscrewing core. The elastomer seal became geometry instead of a component.

IM PART · REF 01
Petals into the body, thread into the steel
STATE · CONSOLIDATED
CORE · UNSCREWING
TOL · ±0.05 mm
PROCESS · IM · 80–650 t
03 · On the floor

One press, one operator, one number

The part now runs on the 120 t Chen Hsong in a four-cavity tool. Scrap is measured per shift and logged against the mould, not the shipment.

IM PART · REF 01
One press, one operator, one number
PRESS · 120 t
CAVITIES · 4
CYCLE · 18 s
PROCESS · IM · 80–650 t
§ Before / after

Every line was measured on the same programme, before and after the change.

BeforeAfterΔ
Parts per assembly31−2
Tools maintained31−67%
Unit cost (index)10069−31%
Assembly labour1 cellNone−100%
Scrap rate4.1%0.8%−80%
Lead time42 days21 days−50%

The line stopped being an assembly line. It became a packing line.

Operations lead, EU distributor
§ Process record
Resin
PA66, unfilled
Press
120 t Chen Hsong
Tooling
4-cavity, unscrewing core, in-house steel
Tolerance
±0.05 mm on thread pitch diameter
Cycle
18 s validated
Volume
1.2 M parts / year

Bring us a part like this

Send a drawing or a sample. You get a DFM read, a tool plan and a cycle estimate — not a brochure.