§ 02 / Case study

A blower that stopped humming.

Appliances · OEM tier 1

Re-gated impeller tool holds ±0.10 mm balance straight off the press — the customer's hand-weighting station was deleted.

±0.1 mm
Held tolerance
99.4%
First-pass yield
240 k
Units shipped / yr
IM PART · REF 01
A blower that stopped humming.
SECTOR · APPLIANCES · OEM TIER 1
PRESS · 180 t Adler
Drag to rotate · scroll to zoom
Problem

Imported impellers arrived out of balance often enough that the OEM was weighting them by hand on the line.

Engineering move

Re-gated the tool to a centre hot drop, tuned pack pressure per blade, and locked the resin to a single PP-GF20 batch supplier.

Result

Balance held straight off the tool. The hand-weighting station was deleted from the customer's line.

§ The narrative
01 · The symptom

Vibration you could hear from the corridor

Thirteen blades, each one filling at a slightly different rate from an edge gate. Mass distribution wandered by shot, and the imbalance showed up as noise at 2,400 rpm.

IM PART · REF 01
Vibration you could hear from the corridor
STATE · EDGE GATED
BALANCE · DRIFTING
NOISE · FAIL
PROCESS · IM · 80–650 t
02 · The engineering move

Fill the hub, not the rim

A centre hot drop makes the flow front radially symmetric — every blade sees the same pressure history. Pack profile was then tuned per blade set on a moulding trial matrix.

IM PART · REF 01
Fill the hub, not the rim
GATE · CENTRE HOT DROP
SYMMETRY · RADIAL
TOL · ±0.10 mm
PROCESS · IM · 80–650 t
03 · The proof

Balance certified per lot, not per complaint

Every lot ships with a balance and dimensional report. The OEM audits the report, not the parts — and repurposed the weighting bench for final packing.

IM PART · REF 01
Balance certified per lot, not per complaint
PRESS · 180 t
RESIN · PP-GF20
FPY · 99.4%
PROCESS · IM · 80–650 t
§ Before / after

Every line was measured on the same programme, before and after the change.

BeforeAfterΔ
Balance tolerance±0.35 mm±0.10 mm−71%
First-pass yield91.2%99.4%+8.2 pts
Hand rework1 stationNone−100%
Cycle time27 s22 s−19%
Annual volume140 k240 k+71%
Noise complaintsRecurringZero in 18 mo−100%

We budgeted for a weighting cell for the next three years. We deleted the line item instead.

Manufacturing engineer, appliance OEM
§ Process record
Resin
PP-GF20, single-source batch
Press
180 t Adler
Tooling
Single cavity, centre hot drop
Tolerance
±0.10 mm blade pitch
Cycle
22 s validated
Volume
240 k parts / year

Bring us a part like this

Send a drawing or a sample. You get a DFM read, a tool plan and a cycle estimate — not a brochure.

Next case studyFittings that survive the sun.Agriculture · Africa distribution